Land surveying
Level Run Adjustment in Excel: Misclosure, Allowable Error and Correction
An Excel sheet for a level book between two benchmarks of known level: it computes levels by the…
Land surveying
An Excel sheet for a level book between two benchmarks of known level: it computes levels by the…
Land surveying
An Excel sheet for designing a parabolic vertical curve between two grades: it gives a level table at…
Land surveying
An Excel sheet that computes the area and perimeter of an irregular plot from its corner coordinates, with…
Land surveying
An Excel sheet that converts latitude and longitude to UTM (easting and northing) and back with Krüger series…
Land surveying
An Excel sheet that computes the slope of every profile segment as a percentage, as 1:n and in…
Project management & contracting
An Excel punch list for handover: log each item with location, discipline, priority and owner to get due…
Project management & contracting
An Excel register for owned and rented site equipment: start date, daily cost, fuel, operator and utilisation, with…
Project management & contracting
An Excel sheet to track shop drawings, samples and data sheets sent to the consultant: review dates, status,…
Project management & contracting
An Excel cash flow for a construction contract: from contract value, duration and progress curve it builds monthly…
Project management & contracting
An Excel sheet for managing construction project risks: log risks and score probability and impact to get a…
Quantity takeoff & pricing
An Excel sheet that estimates building cost per square metre: pick building type, finish level and location, enter…
Quantity takeoff & pricing
An Excel doors and windows schedule: enter mark, material, size and quantity and it computes areas, cost by…